Barry Callebaut Poland - Lodz - Pologne
- Chocolate processing plant
Expansion of manufacturing buildings. Which subsequently required an administrative premises extension.
As a result, the operation is composed of:
- a new construction of around 1100m² floor area,
including office space, a microbio laboratory, a cafeteria, several meeting rooms, a reception, and technical rooms; - existing premises redevelopment on 2 floors (about 750m²), which new functions: offices, application laboratory, M / F changing
Floor area
- new building: 1100 m²
Total floor area
- existing building: 750m²