Barry Callebaut Poland - Lodz - Pologne

- Chocolate processing plant

Expansion of manufacturing buildings. Which subsequently required an administrative premises extension.

As a result, the operation is composed of:

  • a new construction of around 1100m² floor area,
    including office space, a microbio laboratory, a cafeteria, several meeting rooms, a reception, and technical rooms;
  • existing premises redevelopment on 2 floors (about 750m²), which new functions: offices, application laboratory, M / F changing

Floor area

  • new building: 1100 m²

Total floor area

  • existing building: 750m²